EPG will usually adhere to it business spirit of being practical, modern, productive and outstanding to make the top intercontinental transmission drive. we source chromed bar and tubes for hydualic and pheumatic cylinders. We will provide ideal providers and high quality products with all sincerity.
Multifunction EPTT Passenger EPTs EPT EPTT Elevate EPTT EPT EPT
A Maker EPT ON Design EPT fifteen A long time |
Programs |
* EPTT constructing building:Household EPTT, EPTT constructing
* OEM Mini carry/ hoist: Bridges, Chimneys, EPTT
* EPT hoist: EPTTs, factories
* Twin mast hoist: EPT obligation load requirement
* Lean hoist: EPT bridges’ Pier
* Mast Climbing function system(Climber): For developing decoration outside the house alternatively of scaffoldings
Primary PARAMETERS OF Development EPT |
EPTT Carry for EPT materials staff passengers lifting EPTT 500kg~3000kg load ability
Its primary sequence incEPTT:
one. Low, medium, and substantial-pace variable frequency EPTT facade EPT EPT Carry.
two. EPT goal construction hoist, these kinds of as EPTT EPTT chilly drinking water tower construction lifts, mini rack EPTT facade EPT EPT Carry. for tower crane, and EPT EPTT facade EPT EPT Carry.
3. Mast climbing working system, Mast climber
four. EPTs EPTT hoist, materials system
five. Suspended Platform, Wall gondolas, construction cradle
six. Other OEM type rack and pinion EPTT facade EPT EPT Carry., passenger hoist, rack raise.
Lower pace EPTT raise
Attribute | Model | Rated Loading | EPT Pace | EPT EPTT | Security unit | VFD |
EPTT cabin | SC200/200 | 2 times2000kg | -40m/min | 2 instances(three times11kw) | SAJ40-1.two | 37KW 30KW |
SC150/150 | 2 times1500kg | -40m/min | 2 instances(2 times15kw) | |||
SC100/100 | 2 times1000kg | -40m/min | 2 moments(2 times11kw) | SAJ30-one.2 | 30KW | |
Single cabin | SC200 | 2000kg | -40m/min | three times11kw | SAJ40-1.2 | 37KW 30KW |
SC150 | 1500kg | -40m/min | two times15kw | |||
SC100 | 1000kg | -40m/min | 2 times11kw | SAJ30-1.two | 30KW |
Medium speed EPTT raise
Attribute | Model | Rated Loading | EPT Pace | EPT EPTT | Security system | VFD |
EPTT cabin | SC200/200 | two times2000kg | -63m/min | two instances(three times15kw) | SAJ40-one.2 | 55KW 45KW |
SC150/a hundred and fifty | 2 times1500kg | -55m/min | 2 times(two times19kw) | |||
Solitary cabin | SC200 | 2000kg | -63m/min | three times15kw | SAJ40-1.2 | 55KW 45KW |
SC150 | 1500kg | -55m/min | two times19kw |
Main ASSEMBLY Parts FOR Construction EPT |
All construction Lift areas are properly produced, inspection, test and debugged ahead of manufacturing unit loading. Our development carry have handed CE stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds, and acquired European clients praise soon after use.
Development EPT IN Inventory |
We can prepare quick shipping after orEPTTconfirmed, all parts are well packages just before manufacturing unit loading.
EPTAGES ampSHIPPING |
OVERSEA Venture Site FOR Services |
Allow US KNOW Much more ABOUT YOUR Need FOR A QUOTATION |
For quotation of building raise need to have under simple infor.
gt EPT heigEPTT ?
gt Single Cage or Twin cage? With procedure cabin or not?
gt Loading ability for every cage?
gt What‘s kind of pace do you ask for?
gt Mast tower: Painting coat or Hot galvanized coat?
gt What is your nearby EPTT source? 380v/60hz 3P or other kind?
gt For Electric handle system: Do you want Schneider, EPT brand or other similar Manufacturer?
gt Is the installation location a open up place or room restricted? If area minimal, enable us know the set up
place measurement or send out us a drawing make sure you.
gtFOB Price or CIF price? If CIF value, allow us know your vacation spot port please.